Welcome to the Architecture and Civil Engineeering Labs wiki

Disruption in the Labs.

From the 30th April the Structures Lab(6 east 1.13) will be closed for a period of approx 6 weeks,  as we will be carrying out major changes to the hydraulic system and installing a new mezzanine floor.

Please be aware that 6 east 1.13 will become a construction site and will no longer be under the control of the department during these times, thus there will be no general access.


The other labs should remain open as normal, and should experience little if any disruption from the planned works.


We expect the Structures lab to become accessible again in early - mid June.  Although after this date there may be minor dissruption for the continued installation and setup of new machinary.


Further updates will be posted here as we get them.


 